New toilet on the ground floor
It was planned for a long time. When there was the financing there was no holding. We have renovated the toilet on the ground floor from scratch. Nothing has remained as it was. The intermediate door disappeared, the old tiles disappeared. Almost seven weeks the reconstruction lasted: old walls often contain unknown challenges to the craftsmen. So here too. The wall to the office had to be stabilized again. And instead of only dry construction, walls had to dry out before the next trades could take place.
Now behind the sliding door conceals a room with a new sink and toilet. For a nice decoration was still enough money.